👷 Trader Control Mode
Send via WhatsApp
Safe Electric Registered • ETCI Certified

CruxAI Tech Limited

Linenfield Crescent, Ballymakenny Road, Drogheda, Co Louth
Tel: +353879735222Email: dev@cruxai.ie
✓ OFFICIAL PAID TAX RECEIPT
Ref: INV-2026-2FSHO
Date: 10/11/2026
Prepared For
John Doe
14 Millmount Abbey, Drogheda, Co. Louth • Eircode: A92 P5XN
Contract / Works Title
18-Way Fuseboard Upgrade and Safe Electric Cert

“18-Way Metal Clad Consumer Unit with RCBOs and Type 2 SPD (Materials) (€340) • Remove old board, install and terminate Consumer Unit, circuit testing (Labour) (€420) • Safe Electric Completion Certificate and Periodic Test Report (€80)”

Itemised Scope of Works & Materials

DescriptionCategoryAmount (€)
18-Way Metal Clad Consumer Unit with RCBOs and Type 2 SPD (Materials)Materials€340.00
Remove old board, install and terminate Consumer Unit, circuit testing (Labour)Labour€420.00
Safe Electric Completion Certificate and Periodic Test ReportLabour€80.00
Materials Subtotal€340.00
Labour & Certification Subtotal€500.00
Net Subtotal (ex. VAT)€840.00
13.5% Reduced Trade VAT (2/3 Rule Met)€113.40
Total Paid in Full€953.40
Job Schedule & Calendar SyncPROPOSED
2026-11-12 • Morning (09:00 – 12:00)
Need to move this time slot? Both customer and professional can reschedule here.
Payment Schedule: 40% Materials & Booking Deposit on acceptance • 60% Balance upon completion & Safe Electric certification.
Trade Certification & Guarantee: All electrical works are carried out and tested in strict accordance with ETCI National Rules for Electrical Installations (I.S. 10101). Official Safe Electric Completion Certificate issued upon final payment. 12-month workmanship guarantee.
PAID IN FULL on 10/11/2026
Ref: INV-2026-2FSHO • Site Eircode: A92 P5XN
Powered by The Lads — Work, Sorted